Report Output

Top Up Down  A A

After measure estimation is completed, the quality-control fit statistics are computed, and the measures are reported. Table 4 is deliberately reported out of order because it is often lengthy.

 

 

The final automatic step is the reporting is of bias or interaction between elements, if specified in the specification file.

 

 

Then the automatic analysis ceases, and Facets waits for your instructions.

 

 


Help for Facets Rasch Measurement Software: www.winsteps.com.